30 July 2003: View from Front
The front hill is graded down and backfilling along foundation is starting, all this in our light rains!
Grading & Backfilling
24 July 2003: Kitchen
Our first furniture delivered: an oak rolltop desk to match our kitchen cabinets and steel & black stools to match our Kenmore Elite appliances
Furniture
21 July 2003: Loft
All the trimmings are finished: sealed wood, stair rails, special order switchplates. Now for a lot of dusting and some work on the land.
All the Trimmings
17 July 2003: Master Suite
Unfinished pine flooring is now sanded and sealed, and so are all thresholds and vents
Pine Flooring
16 July 2003: Great Room
The unfinished pine stairs and master bedroom floor get their first coat, will be finished tomorrow!
Finished Stairs
14 July 2003: View from Front
Copper installed on sides of chimney, sealing of unfinished pine floors is being worked on, exterior rails are in. Waiting on paving and grading
Log Home Model
11 July 2003: View from Billboard
Parking lot is being prepared: graded and gravel laid
Parking Lot
10 July 2003: Great Room
An all day photo shoot for Shades of Light and Rugs Under Foot catalogs, very interesting!
Photos
Photo Shoot!
9 July 2003: Front Porch
Quite a day! Railing are installed (working on touch ups), last minute work on cabinets and masonry, and the parking lot is graded!! Shades of Light sets up for tomorrow's photo shoot.
Railings & Parking
7 July 2003: Loft
Carpet for the loft, as well as the railings, was installed today! Some work on porch railings was done as well. Lots of trim was finished and accessories for the bathrooms were purchased.
Carpet & Railings
6 July 2003: Great Room
Gas logs installed today
Gas Logs
5 July 2003: Kitchen
Cypress floors are in, as well as all the appliances and most switchplates
Flooring & Appliances
3 July 2003: Hall Bath
Plumbers have installed sinks, most of the electrical work is done too. Flooring continues, along with trim. It continues to rain, so the driveway is still on hold...
Hall Bath
2 July 2003: Great Room
Australian Cypress floors, as well as sinks, are installed
Cypress Floors
1 July 2003: Kitchen
Backsplash is up! Phone company in today, more rain in the forecast, delaying driveway
Finished Backsplash